Ali, A K (2019) A case study in developing an interdisciplinary learning experiment between architecture, building construction, and construction engineering and management education. Engineering, Construction and Architectural Management, 26(09), 2040–59.

Chan, D W, Olawumi, T O and Ho, A M (2019) Critical success factors for building information modelling (BIM) implementation in Hong Kong. Engineering, Construction and Architectural Management, 26(09), 1838–54.

Chen, Y, Yin, Y, Browne, G J and Li, D (2019) Adoption of building information modeling in Chinese construction industry. Engineering, Construction and Architectural Management, 26(09), 1878–98.

Gao, J, Ren, H and Cai, W (2019) Risk assessment of construction projects in China under traditional and industrial production modes. Engineering, Construction and Architectural Management, 26(09), 2147–68.

Iskandar, K A, Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(09), 2023–39.

Jin, R, Zou, P X, Li, B, Piroozfar, P and Painting, N (2019) Comparisons of students’ perceptions on BIM practice among Australia, China and UK. Engineering, Construction and Architectural Management, 26(09), 1899–923.

Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(09), 2060–83.

  • Type: Journal Article
  • Keywords: Integration; Case study; Project management; Strategic management;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-04-2018-0154
  • Abstract:
    Construction project management outcomes in the literature typically portray significant deviations from expected outcomes. Various theories from studies that focus superficially on causes of project cost and time overruns rather than root causes have not addressed this problem. The need is for a better understanding of how procurement strategy provides a fundamental means to address this problem. The purpose of this paper is to examine the procurement strategy used to deliver a new universities project in South Africa within budget and to ascertain its influence on the outcomes. Design/methodology/approach A case study was designed to provide a comprehensive and intensive methodology to identify and examine the construction procurement strategy and its influence on the project outcomes. Document analyses and semi-structured interviews were used to collect data on the construction procurement strategy and outcomes from the client team. Findings The evidence brought forward demonstrates that the successful outcome was largely a consequence of the client team, procurement strategy and systems of delivery. However, the collaborative procurement strategy formed the basis of the successful project delivery and outcomes. A general observation from the data is that an appropriate construction procurement strategy developed by an experienced client team and proactively implemented by an integrated delivery team working collaboratively is likely to achieve the intended project outcomes. Practical implications The findings show three critical keys to achieving intended outcomes – people, procurement strategy and systems of delivery at the governance, portfolio, programme and project management levels. Originality/value The value of this paper lies in using a comprehensive methodology to study the relationship between procurement strategy and outcomes. The findings can be applied by client teams to achieve better outcomes and value for money in infrastructure projects.

Lavikka, R H, Kyrö, R, Peltokorpi, A and Särkilahti, A (2019) Revealing change dynamics in hospital construction projects. Engineering, Construction and Architectural Management, 26(09), 1946–61.

Lee, C (2019) Financing method for real estate and infrastructure development using Markowitz’s portfolio selection model and the Monte Carlo simulation. Engineering, Construction and Architectural Management, 26(09), 2008–22.

Manu, P, Mahamadu, A, Booth, C, Olomolaiye, P O, Coker, A, Ibrahim, A and Lamond, J (2019) Infrastructure procurement capacity gaps in Nigeria public sector institutions. Engineering, Construction and Architectural Management, 26(09), 1962–85.

Marefat, A, Toosi, H and Mahmoudi Hasankhanlo, R (2019) A BIM approach for construction safety: applications, barriers and solutions. Engineering, Construction and Architectural Management, 26(09), 1855–77.

Nadafi, S, Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(09), 2107–19.

Pantzartzis, E, Price, A and Edum Fotwe, F (2019) Roadmap layers and processes: resilient and sustainable care facilities. Engineering, Construction and Architectural Management, 26(09), 1986–2007.

Panwar, A, Tripathi, K K and Jha, K N (2019) A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects. Engineering, Construction and Architectural Management, 26(09), 1924–45.

Roberts, C, Edwards, D J, Hosseini, M R, Mateo-Garcia, M and Owusu-Manu, D (2019) Post-occupancy evaluation: a review of literature. Engineering, Construction and Architectural Management, 26(09), 2084–106.

Wu, C, Chen, C, Jiang, R, Wu, P, Xu, B and Wang, J (2019) Understanding laborers’ behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(09), 2120–46.